Skip to content
On this page

TeGo v5.20.0 to v5.21.0 upgrade notes ​

Target version: v5.21.0
Upgrade path: v5.20.0 to v5.21.0
Release date: 2026-11-24
Audience: Customers, business leads, delivery teams, operations teams, and platform administrators

Upgrade overview ​

This release improves connector migration and internal network access, electronic invoice attachments, and plugin message delivery. EHS Safety Management updates hot work permits, shutdown schedules, inspection materials, and registers. Kubernetes and k3s run background tasks separately, so operations teams need to monitor both the API and background task services.

  • Remote tool settings migrate to connectors: Eligible manual remote MCP configurations retain service addresses, credentials, and digital employee associations. Local command configurations can still be maintained manually.
  • Connectors can reach internal services: Ordinary private network addresses are no longer blocked by default. The relay's own addresses and cloud metadata addresses remain restricted.
  • Electronic invoice attachments: Send OFD files to conversations from web or mobile. Mobile also supports XML electronic invoices.
  • Plugin confirmations and message delivery: Fixed manually typed web confirmations that were not recognized as user input. Plugins can message users through the corresponding digital employee while a delegation is valid.
  • EHS hot work permits: Enter gas analysis before approval. At the start of work, the system checks the most recent analysis and captures the shift supervisor's handwritten permit verification signature.
  • EHS operations: Skip scheduled work during shutdowns, organize inspection materials by the eight work safety standardization elements, flag duplicate register imports, and delete register records in batches.

Platform updates ​

1. Connector migration and configuration ​

  • Eligible manually configured MCP services accessed by URL migrate to enabled workspace connectors. Migration preserves service addresses, request header credentials, and digital employee associations.
  • Each distinct credential is stored in an encrypted workspace account. Digital employees keep their own account associations. A missing credential does not fall back to someone else's credentials.
  • Connector visibility follows the original digital employee usage permissions and the scope of the configuration template. Previously tenant-wide grants become available across the workspace.
  • Local process MCP configurations can still be kept, added, or edited manually and distributed with configuration templates. Manage remote network services through connectors.
  • The migration preview shows only the remote service host and request header names. It does not reveal credential values. Digital employees that lack a credential are marked no_key.
  • Fixed hosted service migrations that failed because a name was missing or already in use.

2. Internal network access ​

Connectors can access ordinary private network addresses. The relay's own addresses and cloud metadata addresses remain blocked by default. Use MCP_PRIVATE_HOST_ALLOWLIST to configure exceptions for those addresses.

3. Conversations and plugin host capabilities ​

  • The web and mobile file pickers support OFD electronic invoice attachments. The mobile picker also supports XML electronic invoices.
  • Fixed an issue where the web app did not identify manually typed messages as user input, causing plugins to reject text confirmations.
  • A2UI replies in conversations drop their outer card border to match other digital employee messages.
  • Host API 1.52.0 adds assistant.post. While a delegation is valid, a plugin can post to a user's conversation as the corresponding digital employee and send a push notification. The same deduplication key does not deliver twice to the same user. The API reports when delivery fails.

4. Deployment and operations ​

  • Kubernetes and k3s run the API and background task services separately. Scale API replicas to adjust API and download throughput. The worker handles periodic tasks, queues, and status reconciliation.
  • Set TEGO_ROLE to all, api, or worker. The default is still all, which Compose continues to use.
  • Detailed health checks show the most recent run time and errors for background tasks.
  • Fixed cases where new digital employees could not install tenant plugins and related queue tasks failed.
  • When a digital employee is deleted after a configuration rollout is published, its rollout target is marked canceled instead of remaining pending.

Plugin updates ​

EHS Safety Management 2.14.0 to 2.15.0 ​

Host requirement: Host API ^1.36.0

Work permits and hot work ​

  • Enter hot work gas analysis before approval. On-site confirmation checks whether analysis data is complete. Special-grade and Grade I hot work require at least one analysis record.
  • After approval, you can add follow-up measurements. Confirm the actual work time at the start of work. Only the most recent analysis must be within 30 minutes before the start time, and no analysis may be dated after the start time.
  • At the start of hot work, record the shift supervisor's name and handwritten permit verification signature in the corresponding fields. The permit verifier is no longer required when closing out the work.
  • Fixed gas analysis table placement on hot work, confined space, and temporary electrical work permits. Records that exceed the table's capacity appear on supplementary pages.
  • Adjusted permit print layouts for signatures, hot work operator certificates, and time formatting.

Shutdown schedules and inspection materials ​

  • Company administrators can set shutdown periods on the organization page. Scheduled inspections and annual activities due during the shutdown are skipped and are not reissued after production resumes. New employee onboarding training still goes out, and tasks already issued are unaffected.
  • Inspection materials are filed under the eight top-level elements of the GB/T 33000-2016 work safety standardization standard. Empty folders remain visible.
  • Exported ZIP files are organized by element folder and material type. The index document shows each file's element. The Work Safety Standardization (“安全生产标准化”) topic can include all sources.

Registers and risk management ​

  • Register import previews flag rows that exactly match an existing record or an earlier row in the import. Flagged rows can be removed. Keeping them requires confirmation. Records with the same name but different field values are not flagged as duplicates.
  • The production basics and hazardous chemical lists support batch deletion. Existing deletion rules still apply to each record. If one record blocks deletion, none are deleted, and the interface identifies the blocked record.
  • Fixed editing rows in the import preview.
  • Register changes to equipment with the same category and name are combined into a pending risk reassessment recommendation to avoid repeat notices for the same reason.
  • Multiple warning signs can be selected or given custom names. The limit of four is removed. The notification card shows images for the first four preset signs, and the other signs appear as text under control measures.
  • The buildings and structures list shows business fields such as name, structure, number of floors, area, use, and fire rating.

Responsibilities, assessments, and documents ​

  • The job page identifies staff not covered by the current work safety responsibility system.
  • Entering the person being assessed in an annual assessment matches the job, responsibility record, and any assessor not yet entered. If there are no assessment items, the form generates a table. Existing fields are preserved.
  • Fixed annual assessments that did not include all responsibilities from job-named responsibility records.
  • Signature sections in annual assessments and safety responsibility agreements identify signing roles and show the corresponding names where entered.
  • Draft management system documents support online editing for .docx attachments.
  • Fixed PDF previews blocked by the browser and added previews for text boxes in uploaded training materials.

New plugin ​

Host requirement: The release manifest does not specify a Host API requirement.

This release adds one plugin. The manifest does not provide its public name, version, or feature details. Confirm its official release information and host compatibility before enabling it.

Upgrade impact and precautions ​

Platform ​

Connector migration and permissions ​

  • Before upgrading, review manually configured remote MCP services, credentials, and digital employee usage permissions. Check the migration preview.
  • Unsupported remote configurations are removed, including ones with URL query parameters or fragments, loopback addresses, OAuth, or client certificates. For services you still need, confirm a supported connector setup. Local command configurations are retained.
  • Migrated tools retain their previous behavior of running without confirmation. Migrated accounts can run the tools listed during migration. Hosted service connectors created by the migration also run without confirmation. Administrators should review the scope of tool access.
  • Digital employees with missing credentials are not linked to connectors. Resolve no_key entries individually.
  • Connectors can now reach ordinary private network services. Administrators should review the services that connectors can reach. MCP_PRIVATE_HOST_ALLOWLIST only grants exceptions for the relay's own addresses and cloud metadata addresses.
  • The manual configuration editor accepts only local commands. It rejects remote addresses and local entries with names that duplicate hidden configurations.

Deployment and configuration ​

  • For Kubernetes and k3s, use the matching deployment configuration. Check that both API and background task services run. Include the background task service in custom network policies, permissions, and monitoring.
  • If you set TEGO_ROLE=api, run a separate worker. The API process does not execute background tasks. Compose deployments using the default all mode need no changes for the role split.
  • The release manifest does not specify database migration or rollback steps. Back up the database and essential configuration before upgrading, following your operations procedures.

Plugins ​

  • EHS Safety Management: The host must meet Host API ^1.36.0. After upgrading, explain the new order for hot work gas analysis, start time confirmation, and shift supervisor permit verification to permit approvers.
  • Shutdown schedules: Scheduled tasks skipped during a shutdown will not be reissued after production resumes. Confirm your operating schedule before setting the shutdown period. Continue handling already issued tasks through the existing process.
  • Batch deletion: Check the selected records before deleting. Batch deletion still follows the existing record-level restrictions.
  • New plugin: Before enabling it, confirm its public name, version, host requirements, permissions, and data handling. The current manifest does not specify these details.

Verification checklist ​

Platform ​

  • [ ] Review the remote MCP migration preview. Verify service addresses, accounts, digital employee associations, and visibility scope.
  • [ ] Call tools from digital employees that use different credentials. Verify that each uses the correct account and that missing credentials show no_key.
  • [ ] Verify that local command configurations can be kept and edited and that remote services are managed through connectors.
  • [ ] Call an approved internal service through a connector.
  • [ ] Send an OFD attachment from both web and mobile. Send an XML attachment from mobile.
  • [ ] Type a plugin's requested text confirmation in the web app and verify that it is recognized as user input.
  • [ ] If plugin message delivery is integrated, verify that messages arrive under a valid delegation, the same deduplication key does not deliver twice, and delivery stops after the delegation expires.
  • [ ] In Kubernetes or k3s, verify that the API and background task services are healthy. Check one periodic task and one queue task.
  • [ ] Create a digital employee and verify that tenant plugins install. Check that rollout targets for deleted digital employees do not stay pending.

Plugins ​

EHS Safety Management ​

  • [ ] Complete a hot work flow. Verify gas analysis before approval, the 30-minute validation at startup, and the shift supervisor's handwritten permit verification signature.
  • [ ] Preview or print hot work, confined space, and temporary electrical work permits. Check gas analysis, signature, and time placement.
  • [ ] Set a shutdown period for verification. Check that scheduled tasks due during the period are skipped and that existing tasks and onboarding training are unaffected.
  • [ ] Export inspection materials. Check that the eight element folders, ZIP structure, and index document agree.
  • [ ] Import the same register again. Verify duplicate detection, duplicate row removal, and inline editing. Verify that a blocked record prevents the entire batch deletion.
  • [ ] Verify multiple and custom warning signs and the merging of reassessment recommendations for equipment with the same name.
  • [ ] Check the list of staff not covered by the responsibility system, automatic annual assessment matching, and signing role labels.
  • [ ] Edit a draft Word attachment online and preview a PDF and training material with text boxes.

New plugin ​

  • [ ] Confirm the official name, version, and host compatibility before deciding where to enable the plugin and what business flows to verify.